Welcome to the new version of CaltechAUTHORS. Login is currently restricted to library staff. If you notice any issues, please email coda@library.caltech.edu
Published July 22, 2014 | Published
Book Section - Chapter Open

Equipment Vibration Budget for TMT

Abstract

Vibration from equipment mounted on the telescope and in summit support buildings has been a source of performance degradation at existing observatories, for adaptive optics performance in particular. To ensure that that the total optical performance degradation due to vibration is less than the corresponding optical error budget allocation, a vibration budget has been created that specifies allowable force levels from each source of vibration in the observatory (e.g., pumps, chillers, cryocoolers, etc.). In addition to its primary purpose, the vibration budget allows us to make design trade-offs, specify isolation requirements for equipment, and tighten or widen individual equipment vibration specifications as necessary. Defining this budget relies on two types of information: (i) vibration transmission analysis that determines the optical consequences that result from forces applied at different locations in the Observatory and at different frequencies; and (ii) initial estimates for plausible source amplitudes in order to allocate force budgets to different sources in the most realistic and cost-effective manner. The transmission of vibration from sources through to their optical consequences uses the finite element model of the telescope structure, including primary mirror segment models and control loops. Both the image jitter and higher-order deformations due to M1 segment motion are included, along with the spatial- and temporal-correctability by the adaptive optics system. Measurements to support estimates of plausible soil transmissibility are described in a companion paper. As the detailed design progresses and more information is available regarding what is achievable at realistic cost, the vibration budget will be refined.

Additional Information

© 2014 SPIE. The TMT Project gratefully acknowledges the support of the TMT collaborating institutions. They are the Association of Canadian Universities for Research in Astronomy (ACURA), the California Institute of Technology, the University of California, the National Astronomical Observatory of Japan, the National Astronomical Observatories of China and their consortium partners, and the Department of Science and Technology of India and their supported institutes. This work was supported as well by the Gordon and Betty Moore Foundation, the Canada Foundation for Innovation, the Ontario Ministry of Research and Innovation, the National Research Council of Canada, the Natural Sciences and Engineering Research Council of Canada, the British Columbia Knowledge Development Fund, the Association of Universities for Research in Astronomy (AURA), the U.S. National Science Foundation and the National Institutes of Natural Sciences of Japan.

Attached Files

Published - MacMartin_2014p91452O.pdf

Files

MacMartin_2014p91452O.pdf
Files (2.6 MB)
Name Size Download all
md5:14e1827190bd1e421cf2dcbfcf4a4173
2.6 MB Preview Download

Additional details

Created:
August 20, 2023
Modified:
January 13, 2024