Welcome to the new version of CaltechAUTHORS. Login is currently restricted to library staff. If you notice any issues, please email coda@library.caltech.edu
Published February 2011 | Published
Journal Article Open

Results from a prototype chicane-based energy spectrometer for a Linear Collider

Abstract

The International Linear Collider (ILC) and other proposed high energy e+e− machines aim to measure with unprecedented precision Standard Model quantities and new, not yet discovered phenomena. One of the main requirements for achieving this goal is a measurement of the incident beam energy with an uncertainty close to 10^(−4). This article presents the analysis of data from a prototype energy spectrometer commissioned in 2006-2007 in SLAC's End Station A beamline. The prototype was a 4-magnet chicane equipped with beam position monitors measuring small changes of the beam orbit through the chicane at different beam energies. A single bunch energy resolution close to 5·10^(−4) was measured, which is satisfactory for most scenarios. We also report on the operational experience with the chicane-based spectrometer and suggest ways of improving its performance.

Additional Information

© 2011 IOP Publishing Ltd and SISSA. Received: November 15, 2010; accepted: January 17, 2011; published: February 2, 2011. We would like to thank all SLAC staff who helped with the experiment and machine operation. We would also like to thank our funding bodies, in particular: The Commission of the European Communities under the 6th Framework Programme "Structuring the European Research Arm," contract number RIDS-011899 and the Science and Technology Facilities Council (STFC), LCABD program for funding the UK institutions. The U.S. Department of Energy under contract DE-AC02-76SF00515 for supporting this work at SLAC. The U.S. Department of Energy under contract DE-FG02-03ER41279 for supporting the colleagues at University of California and LBNL. The Research Corporation under contract NSF PHY0529471, and the U.S. Department of Energy under contract DE-FG02-05ER41383 for funding the work in University of Notre Dame.

Attached Files

Published - Lyapin2011p13120J_Instrum.pdf

Files

Lyapin2011p13120J_Instrum.pdf
Files (770.5 kB)
Name Size Download all
md5:54b57e6f8e628dd517cf22530f2fdec2
770.5 kB Preview Download

Additional details

Created:
August 22, 2023
Modified:
October 23, 2023