Strong motion earthquake accelerograms, digitized and plotted data, Volume II - corrected accelerograms and integrated ground velocity and displacement curves; Part F - Accelerograms IIF086 through IIF105
Abstract
This issue, Volume II, Part F, Report No. EERL 73-51 continues with the accelerograms obtained during the San Fernando Earthquake of February 9, 1971 and includes one record from each of the following: the CMD Building in Vernon, the Orange County Engineering Building in Santa Ana, the Municipal Services Building at 633 East Broadway in Glendale, the Southern California Edison Company in Colton, Ft. Tejon, the Pearblossom Pumping Plant, the Oso Pumping Plant in Gorman, and the UCLA Reactor Lab in Los Angeles, and three records each from the buildings at 808 S. Olive, 2011 Zonal, 120 N. Robertson, and 646 S. Olive, all in Los Angeles. The uncorrected versions of the accelerograms in this issue appeared earlier in Volume I, Part F, Report EERL 71-23.
Additional Information
PB 224 977/ASFiles
Name | Size | Download all |
---|---|---|
md5:5ac85af1f3ac3f9e5d87033043079be5
|
21.1 MB | Preview Download |
Additional details
- Eprint ID
- 26304
- Resolver ID
- CaltechEERL:1973.EERL-73-51
- Created
-
2001-08-29Created from EPrint's datestamp field
- Updated
-
2019-10-03Created from EPrint's last_modified field
- Caltech groups
- Earthquake Engineering Research Laboratory